False reporting NGO & field transport

Field visits reported — GPS showed elsewhere

Sajida Foundation · NGO & field transport

35 field vehicles

মাঠে না গিয়ে ভিজিট দেখানো — জিওফেন্স চেক-ইন দিয়ে বন্ধ।

Community program transport depended on honest location — paper logs were not enough.

Donor audits now get a map-backed visit log — not handwritten sheets.

Sajida Foundation
Field visits reported — GPS showed elsewhere
23%Suspect completionsFirst month
Same dayManager alertOff-route
−40%Audit prep timeExport

The challenge

Field teams used pool vehicles for clinic and outreach runs. Supervisors received end-of-day paper sheets. Donor audits asked for evidence that assigned villages were served. GPS existed on paper contract but was not tied to trip completion.

What went wrong

  • Visit form timestamp did not match vehicle arrival geofence
  • Same driver “completed” two distant sites within impossible window
  • Vehicle parked at home location during declared field hours
  • No central map for program manager during the day

Before VMS

End-of-day paper sheets. No live map for managers.

After Autonemo

Live board + geofence proof + grant-ready export.

How it was investigated

Program geofences were drawn per site. Trip assign required beneficiary or site code. Completion button enabled only inside fence or with photo exception approved by manager.

Rollout timeline

  1. Setup

    Program sites geofenced; trip requires site code.

  2. Go-live

    Complete button only inside fence or photo exception.

  3. Review

    Daily claimed vs actual report to program desk.

Solution with Autonemo VMS Pro

  • Site geofence check-in for trip complete
  • Live map for program desk with late / off-route flag
  • Daily exception report: claimed vs actual location
  • Donor-ready trip history export with map snapshot

Technology used

GPS geofenceTrip assignMobile statusAudit export

VMS modules

TripsLive GPSReportsCompliance

Outcomes

  • False completion attempts visible same day
  • Program managers intervened on off-route vehicles
  • Audit pack preparation time cut for grant reporting